![]() |
|
Event Flooring |
| V & A Shop London | |||
With the launch of the temporary new Victoria & Museum
shop, Evergreens was contacted to supply and install Lazy Grass and our
Crazy Paving lino into the temporary V&A shop. This was done to break
up the polished wooden floor. The theme was to create a pathway to lead
customers around the store with grassed areas to show products available
for sale. Each section of flooring was installed to allow removal in the
future without damaging the new wooden floor. |
|||
![]() |
![]() |
![]() |
![]() |
| Amstel Beer - Champions League | ||
Need your next display to stand out ?, Well that's what
Amstel Beer got for the launch of 2004 Champions League. This campaign
was aimed in Ireland to coincide with the start of the 2004 champions
league, each pitch was manufactured in our factory using our Lazy Grass
and White Match Winner. Each pitch was made and laminated onto timber
in two pieces and each section could be folded in half for ease of transport.
From 3D bill board football pitches to inlayed logos in exhibition flooring.
From Idea to completion Evergreens can offer a total solution. |
||
![]() |
![]() |
![]() |
| Leicester City Council 2004 and 2005 | ||
Evergreens UK was pleased to supply and install 300sqm
of Grass Park Senior for Leicester Expo 04. The installation was started
at 7am and was complete by 10am. The installation included 90 meters
of joins and 70m of anti-trip edge and three tonne of sand to prevent
the edges from lifting in high wind. The event was down for three days
over a Bank Holiday, the Grass Park Junior was carefully rolled up and
donated to the RNIB. |
||
![]() |
![]() |
![]() |
To follow on from the success of Leicester Expo 04, Evergreens was asked to install a artificial grass leisure area for the Leicester Expo 05. This area was increased to 12m wide and 75m long which totaled 1200smq. Installation started at 6am and was completed by 4pm this included over 250 meters of joins and 162 meters of anti trip edges. Once again sand was used to hold the artificial grass in place, over 6 tonnes were used also including various stages being constructed over it. The event was over a bank holiday weekend and removal was done at 5am the next working day with the site clear by 8:30am. |
||
![]() |
![]() |
![]() |
| NFL Super Bowl Party 2004 | |||
![]() |
THE GREATEST SHOW ON TURF Then Evergreens can help, For the Super Bowl 2004 we were
contracted to supply and install 1300 sqm of artificial grass, including
NFL logos and pitch markings to the main outdoor show area. The venue
@ Ministry Of Sound London was fitted in 9 hours using 8 fitters and
2 tonnes of sand to level the outdoor car park. The whole venue was
artificial grassed inside and out including two dance arenas, bar room
and the bar. Also installed was stadium seating for 110 people and 7
plasma screens to watch the game live. The event was removed the following
morning in two hours and returned the club to its original state. |
||
| Sectional Event Flooring | ||
Need your next display to stand out ? But don't have
the space to transport a rolled mat ? Surface to stiff to roll-up or
will be damaged if rolled ? Well if this is the problem you have, then
maybe this service can help. Evergreens cutting service allows for stiff
or large rolled products that are easily damaged in transit to exhibitions
to be cut into sections usually jigsaw shapes. This jigsaw shape allow
for the product to be pushed back together onsite and can be shipped
flat on pallets or in the boot of a car. Also the shape allows for the
joins to be a feature rather than normal straight joins which would
stand out. If this service is of interest please contact us on the number
below. Ask for our CAD department. |
||
![]() |
![]() |
![]() |
| |
| |
| |
| |
Evergreens
UK LTD
- Synthetic
Grass & Entrance
Mats
No. 1-4 Extons Units, Market Overton Ind Est, Oakham, Rutland. LE15 7PP
Tel: 01572 768208 Fax: 01572 768261 Email: sales@evergreensuk.com
URGENT 24HR ORDER LINE 07889 441970